Commercial Solar Hillingdon | Heathrow‑Area Specialists | Free Assessment
`n

Commercial Solar in Hillingdon

Power your Hillingdon business with integrated solar and EV charging solutions. Perfect for office parks, business centers, and modern commercial developments.

Why Hillingdon Businesses Choose Solar

Strategic location near Heathrow, excellent transport links, and growing business district make Hillingdon ideal for commercial solar

🏢

Business District

Growing commercial hub with modern office parks and business centers perfect for solar installations.

• Uxbridge Business Park
• Heathrow proximity
• Modern developments
🚗

EV Integration

Perfect location for solar + EV charging solutions with high commuter traffic and business travel.

• EV charging demand
• Commuter traffic
• Business travel hub
🌱

Green Initiatives

Hillingdon Council actively promotes renewable energy with streamlined planning and green incentives.

• Green business support
• Planning assistance
• Sustainability goals

Hillingdon Solar Success

Real results from local businesses

35+
Businesses Powered
£1.8M
Annual Savings
12MW
Total Capacity
3.8yr
Avg Payback

Calculate Your Hillingdon Solar Savings

Get an instant estimate based on local energy rates and conditions

Solar ROI Calculator

Recommended System

0kW
Solar System Size

Annual Savings

£0
Per Year

Payback Period

0 years
Return on Investment

25-Year Savings

£0
Total Lifetime Savings

Get Your Free Hillingdon Assessment

Local solar experts ready to help your business save

By submitting this form, you agree to our Privacy Policy. We'll contact you within 24 hours.

What Our Clients Say

Real feedback from satisfied customers across London

"The solar installation has reduced our energy costs by 40% and we're on track to save over £50,000 annually. The team was professional and the installation was completed on time."
SJ
Sarah Johnson
Operations Director
Barking Logistics Ltd
"Excellent service from start to finish. The system is performing better than expected and our tenants are happy with the reduced service charges. Highly recommended."
MC
Michael Chen
Property Manager
Croydon Retail Park
"The EV charging integration with solar is perfect for our business park. We've seen a 35% reduction in energy costs and our tenants love the sustainable approach."
EW
Emma Williams
Facilities Manager
Hillingdon Business Centre

Trusted & Certified

Professional certifications and industry recognition

MCS
MCS Certified
Microgeneration Certification
RECC
RECC Member
Renewable Energy Consumer Code
£2M
Public Liability
Fully Insured
25
Year Warranty
Performance Guarantee

Hillingdon Areas We Serve

From Uxbridge Business Park to Hayes & Harlington and the Heathrow perimeter, we design solar for complex commercial sites.

Uxbridge Business Park

Modern office and logistics buildings with consistent daytime loads—excellent self‑consumption profiles.

Hayes & Harlington

Industrial estates with heat‑island effects—design considerations for inverter cooling and maintenance.

Heathrow Perimeter

Air‑traffic proximity requiring robust cleaning schedules, corrosion mitigation, and access controls.

Technical Design

  • Mounting: Ballasted systems for membrane roofs, wind tunnel validated to Eurocodes.
  • Electrical: Multi‑MPPT string inverters for shading resilience; DC cabling routes planned for safe maintenance.
  • Monitoring: Portfolio dashboards, performance alerts, and KPI reports.

Compliance

  • DNO (UKPN): Full G99 submissions, export limitation (G100) where required.
  • H&S: CDM documentation, RAMS, roof access and rescue plans.
  • Fire Safety: Firefighter switches, clear isolation labelling and procedures.

ECO4 & Local Grants

Funding support for energy efficiency measures including commercial solar—eligibility assessed during audit.

  • • Capital contribution or full funding for qualifying measures
  • • Priority for high daytime consumption sites
  • • Assistance with applications and documentation

Smart Export Guarantee

Earn for exported energy with supplier tariffs; export limits coordinated with UKPN.

  • • Metered export and monthly statements
  • • Export limitation hardware supplied if required
  • • Works alongside self‑consumption strategy

Hillingdon FAQs

Will Heathrow proximity affect solar performance?

Aircraft emissions and debris increase cleaning frequency; we plan maintenance to maintain output and warranty compliance.

Do I need planning permission?

Most commercial rooftop systems are permitted development; exceptions include conservation areas or large capacity—handled by our team.